Limba:

Infrastructure

Renewable Energy

Know-how:

  • Project development, basic engineering, design
  • Procurement of: PV modules, inverter stations, equipment for grid connection, etc.
  • Execution of turn - key projects including:
    • electrical works
    • civil works
    • security systems
    • metallic structures
    • overhead and underground lines

 

References:

  • Photovoltaic Plant 10 MW Podari, Dolj county
  • Photovoltaic Plant 9.9 MW Grojdibodu, Olt county
  • Photovoltaic Plant 9.8 MW Berceni I, Prahova county
  • Photovoltaic Plant 9.4 MW Berceni II, Prahova county
  • Photovoltaic Plant 9 MW Lukoil Energy, Prahiva county
  • Photovoltaic Plant 7.5 MW Stanesti, Giurgiu county
  • Photovoltaic Plant 7.5 MW Butimanu, Dambovita county
  • Photovoltaic Plant 6 MW Doba, Satu Mare county
  • Photovoltaic Plant 5.4 MW Leu I, Dolj county
  • Photovoltaic Plant 5 MW Leu II, Dolj county
  • Photovoltaic Plant 1 MW Teasc, Dolj county
  • Photovoltaic Plant 1 MW Turburea, Gorj county
  • Photovoltaic Plant 1 MW Galbiori, Constanta county
  • Photovoltaic Plant 0.5 MW Bucharest (placed on the roof of the building)
  • Wind farm 17.5 MW Cerna, Tulcea county